Existing industrial building with docks in use and, attached, the steel frame of the extension at dusk

Brownfield

You inherit a plant and tie another one to it

An extension looks like the easy case: the plant exists, the network exists, the standard exists. That is exactly the problem.

The short answer

The junction between old and new is resolved in one drawing, in one week, normally by the shortest route: hang the new building off the old network. That one-week decision conditions the next fifteen years of both buildings at once.

Existing industrial building with docks in use and, attached, the steel frame of the extension at dusk

The irreversible part

The decisions specific to an extension

On top of the five that every project has, an extension has its own — and all of them live in the junction.

  1. 01

    Whether the new network hangs off the old one or coexists with it

    Hanging off is faster and cheaper now. It means inheriting addressing, protocols and fifteen-year-old limits, and that a future migration has to stop both buildings instead of one.

  2. 02

    Where the zoning boundary falls

    If the new building is its own IEC 62443 zone, it can be modernised on its own. If it extends the existing zone, it inherits its security level and its calendar.

  3. 03

    Which connection feeds the extension

    Sharing the existing substation saves construction and ties the growth of both buildings to the same contracted power.

  4. 04

    Which data standard is imposed on which

    The default is that the new adapts to the old, because the old is running. That is the right call half the time, and it pays to know which half.

  5. 05

    Whether the tie-in shutdown is used or endured

    Connecting the two buildings requires a shutdown. It is the only cheap one for years: whatever is not done in it will wait.

Common questions

Frequently asked questions

The new building is small compared to the existing one. Is it worth it?

The size of the extension does not change the cost of the junction decision, which is the expensive one. A small extension badly connected limits the whole plant just as much as a large one.

Our existing plant already has SCADA. Isn't extending it enough?

It may be enough and it may be the expensive mistake of the project. It depends on whether that SCADA can export data in a format worth training on, and whether the vendor permits it contractually.

Can you review just the junction rather than the whole project?

Yes, and on an extension that is usually the most useful thing. The junction is where almost everything irreversible concentrates.

Finished modern industrial plant lit up at dusk

Is it already settled how the two buildings connect?

If not, it is the half hour with the highest return in the project.

We call you within 48 h with the decisions you are about to close

Thirty minutes with an engineer on our team. You keep a written summary, whether you hire us or not.

Free and with no commitment. A person gets back to you, not a sales rep. By submitting you accept the privacy policy.