Working material
Checklists, not two-hundred-page manuals
Each fits in a few pages and is written to be taken into a meeting, not filed away.
Available
Pick the one you need now
Click the one you want and we email it to you, adapted to your project type and phase.
What to ask your EPC before signing basic engineering
The clauses that keep the door open without making the contract dearer, written to copy and paste.
Data ownership in equipment purchasing specifications
How it gets lost without anyone noticing, and the exact paragraph that prevents it.
IEC 62443 zoning during construction, not in production
What to leave cabled during the works so later segmentation is configuration.
Validating a control loop with a model inside it
What changes in IQ/OQ/PQ when part of the decision is not a fixed rule.
What to provision during a maintenance shutdown
The short, cheap list that avoids waiting for the next shutdown.
The twelve questions for the new-plant committee
To print and take into the concept design meeting.
Request it
Tell us which one and where to send it
If you also want the thirty-minute call, say so in the same request.
Common questions
Frequently asked questions
Are they free?
Yes. We email them when you ask, with no sales sequence behind it.
Why is there no direct download?
Because each one is adapted to the project type and phase before we send it: a purchasing-spec playbook for a retrofit is not the same as for a greenfield.
Can I share them with my engineers?
Yes, that is what they are for. You can forward them inside your organisation and to your vendors without asking us.